equipping plan: 2 biomass cbf boilers with high temp and high pressure 2 15mw turbo generator sets sets supplying heat by extracting and condensing with a total capability of 30mw
equipping plan: three pulverized coal boiler of high temperature and high pressure at 520t/h and one 125mw extraction condensing turbine and one 60mw combined heat generator set of extraction-back-pressure turbo generator. one boiler and one generator are considered to be expanded when designed.